Product details
Product information
At a glance
Catalogue details
- Catalogue configurations
- 1
- Colour
- Silver
Documents and compliance
Request the current approved file using this product's SKU before relying on a certificate, datasheet or compliance claim.
This kit includes a push handle and a 15mm ball valve designed for use in emergency shower and eyewash systems. It is intended as a replacement component for pre-2021 models. The parts are made to fit vertical assembl...
Description and applications
This kit includes a push handle and a 15mm ball valve designed for use in emergency shower and eyewash systems. It is intended as a replacement component for pre-2021 models. The parts are made to fit vertical assemblies where space and access are limited. They allow manual activation of water flow when needed during an emergency.
The kit helps maintain the functionality of safety equipment that protects against chemical splashes, hazardous substances, or airborne contaminants. It ensures the shower or eyewash can be operated quickly and reliably when someone is exposed to dangerous materials. Proper function is critical to minimise injury in industrial or laboratory settings. The components are built to withstand regular use and environmental exposure.
It is used in workplaces where emergency safety showers and eyewash stations are required, such as factories, labs, or chemical storage areas. The vertical assembly design suits installations where piping runs upward from the floor. Maintenance teams replace worn or damaged parts using this kit to keep safety systems compliant. It does not include the shower head or eyewash bowl, only the activation mechanism.
- Replacement push handle and 15mm ball valve
- Suits pre-2021 emergency shower and eyewash units
- Designed for vertical assembly installations
- Restores manual operation of safety equipment
Delivery, freight and returns
Delivery options depend on the product, quantity and postcode. Review delivery information or ask us to confirm bulky-item and site-access requirements.